PCB Assembly, engineered for production.   BOM review · SMT / THT · Inspection · Delivery

sales@tianyu-pcba.com   ·   GMT+8

Frequently asked questions

Practical answers before the production conversation starts.

A concise guide to file inputs, assembly models, substitutions, inspection and data sharing. Replace the sample answers with your verified company policies before launch.

Engineering review · Production coordination
At a glance
One accountable path from data package to assembled boards.
Use this page as the launch-ready structure; replace the sample metrics and capability statements with verified company facts before publishing.
Quote preparation

Start with the build package.

Use this checklist to make the first review more useful.

  • BOM with manufacturer part numbers and quantities
  • Gerber / fabrication package
  • Assembly drawings and revision notes
  • Inspection or documentation requirements
  • Target quantity and delivery expectation

Send the BOM, Gerber or fabrication files, assembly drawings, and any build notes or inspection requirements. Clear revision identifiers help avoid quoting the wrong package.

Yes. The final route depends on your supply model, component ownership, lead-time constraints and the agreed handling of shortages or alternatives.

Material substitutions should be explicit. The project owner reviews proposed alternatives and approves fit, function, compliance and cost implications before use.

Assembly quantities and minimum order conditions are confirmed per project. The quotation should state both the engineering-build and repeat-volume path.

Supply & production

Questions that shape the quotation.

Inspection scope is agreed per project. Ask for the specific reports, images or records you require so they can be priced and included in the release criteria.

Use the secure file-transfer route agreed with the sales contact. Avoid public links, and remove unrelated personal or confidential data from drawings when possible.

Indicative pricing is possible, but a firm assembly quotation normally requires the actual BOM, current supply conditions and a confirmed production package.

Shipping method, protective packaging and documentation requirements are confirmed in the quotation. Ask for the specific destination and handling needs to be included in the project review.

Project intake

Still need a specific answer?

Share the project context and the constraint behind the question. The reply can address the actual build rather than a generic case.

© 2026 tianyu PCB Assembly. Demo content for launch review.

Privacy · Terms · Sitemap